What Is Shell and Core?

Shell and core is a handover standard in which a leased retail unit is delivered with only the structure, façade and main service connections, while the interior fit-out and fixtures are carried out by the tenant.

A retailer that leases a unit in a new shopping centre often finds bare concrete, an open ceiling and service connections waiting on the wall when it first enters. This is a shell and core handover. The landlord prepares the shell and core of the building: the structure, façade, common areas and main electrical, water, HVAC and fire connections. The store’s floor, ceiling, lighting, shelving and fixtures are then installed during the tenant’s fit-out. The handover standard directly determines the opening budget and timetable.

How does shell and core work?

The technical specification annexed to the lease defines the handover standard in detail: service connection points, electrical capacity, HVAC capacity, sprinkler and smoke detection infrastructure, floor level and shopfront opening, for example. In more advanced handover standards, such as “warm shell”, the ceiling, floor screed and basic lighting may also be provided by the landlord.

With a shell and core handover, the tenant’s investment is high, so tenants usually ask for a tenant contribution or a rent-free period. The fit-out design must comply with the centre’s tenant design guide and be approved by management.

An example of shell and core in retail

A hypothetical example: a clothing chain takes handover of a 600-square-metre unit in a new shopping centre as shell and core. At handover, it is found that HVAC capacity is below the value stated in the specification and the electrical panel has been installed incompletely. The chain’s project team has the shortcomings recorded in the handover report and asks centre management to fix them. As the fit-out takes two weeks longer as a result, the rent-free period is extended by the same amount. The store is ready in time for the centre’s opening, and the fit-out budget stays at the level hypothetically planned per unit.

Key considerations for shell and core

  • The technical specification should be checked item by item before handover, and any shortcomings recorded in the handover report.
  • The fit-out budget should be prepared from a detailed survey based on the handover standard.
  • The rent commencement date should be tied to the actual handover date of the unit.
  • Fire and health and safety approvals should be built into the fit-out timetable from the start.

Related terms

Related terms include store handover date, turnkey, build-to-suit and pre-opening costs.