What Is DRP (Distribution Requirements Planning)?
DRP (distribution requirements planning) is a method that rolls store-level demand forecasts and stock data up through a multi-tier distribution network to plan shipments, capacity and purchase orders.
In a multi-tier distribution network, how much stock the central warehouse holds depends on what the stores will sell tomorrow. DRP, or distribution requirements planning, turns this link into a calculation. Demand forecasts and stock data at store or regional warehouse level are passed upwards to the distribution centre and from there to the supplier. Large grocery chains, DIY retailers and retailers with several regional warehouses use DRP to build shipment, vehicle and purchasing plans. The method originated as an adaptation of material requirements planning (MRP) in manufacturing to the distribution network. It aims to 'pull' goods according to store need rather than 'push' them into the warehouse.
How does DRP work?
The plan starts at the lowest location. For each store, weekly forecast sales, current stock, safety stock and in-transit shipments are put into a table. The week in which stock will fall below the safety level is found, and the shipment date is set by working back by the lead time.
Adding up the planned shipments for all stores gives the distribution centre's gross requirement. The same calculation is repeated for the central warehouse, and purchase orders to suppliers are planned. The demand signal is thus carried upwards tier by tier. The result shows not just product quantities but also warehouse capacity, vehicle requirements and the staffing plan.
DRP example in retail
In a hypothetical example, a DIY chain expects garden product sales to rise ahead of spring. The DRP table shows in which weeks each of its 60 stores will fall below safety stock. The total requirement is passed to the regional warehouses and from there to the central warehouse. The central warehouse places supplier orders a few weeks before demand rises, and shelves are full at the start of the campaign. The same table also shows in which weeks the warehouse team needs to add extra shifts. When the season ends, the plan reduces shipments gradually so that stores are not left with excess stock.
Things to watch with DRP
- Forecast error at store level grows as it moves upwards, so forecast quality should be measured continuously.
- If lead times are not kept up to date with actual data, plan dates will slip.
- The plan should not be approved without checking it against warehouse and vehicle capacity.
- Promotional and seasonal effects should be added to the forecast separately.
Related terms
Concepts used alongside DRP include demand forecasting, S&OP, allocation and replenishment systems, and CPFR.
Last updated: · Source: Retail EMEA Retail Glossary
When quoting, please cite: "What is DRP (Distribution Requirements Planning)?", Retail Glossary, Retail EMEA — https://retailemea.com/glossary/what-is-drp-distribution-requirements-planning/