What Is Handover Date?
A handover date is the date on which a landlord delivers a retail unit to the tenant in an agreed technical condition, typically shell or shell-and-core, marking the start of fit-out and often of the rent-free period.
In a newly opening shopping centre or a re-let unit, the landlord delivers the space to the tenant in a specified technical condition on the handover date. This condition is usually defined as “shell” or “shell and core”: walls, floor, electrical and mechanical connections are ready, but no interior fit-out has been done. The handover date is the starting point for the store opening schedule. Even a single day’s delay has a knock-on effect on the tenant’s opening campaign, staff recruitment and seasonal planning.
How does a handover date work?
The handover date and handover conditions are written clearly in the lease. On the day of handover, the landlord’s and tenant’s technical teams walk the unit together and record any defects in a handover report. Once the report is signed, the tenant starts fit-out works, which must comply with the tenant design criteria.
The handover date is also the start of the rent-free period. The tenant pays no rent, or reduced rent, while fit-out work is under way. If the landlord is late with handover, penalty or additional rent-free clauses in the lease may apply. A delay on the tenant’s side, meanwhile, means the store misses the centre’s opening and loses revenue.
Handover date example in retail
A hypothetical example: an apparel chain leases a unit in a new shopping centre. The lease sets the handover date four months before the centre opens and grants a two-month rent-free period. When handover is a month late, the chain’s fit-out team has to compress its schedule. Thanks to a clause in the lease, the chain receives additional rent-free time equal to the delay.
Things to watch with handover dates
- Handover conditions should be attached to the lease together with the technical specification, leaving no room for differing interpretations.
- Completion dates should be set for defects listed in the handover report.
- Any additional rent-free period or compensation for delays should be clearly defined in the lease.
- The opening schedule should include buffer time for possible slippage in the handover date.
Related terms
Terms related to the handover date include rent-free period, tenant contribution, commercial lease and new store opening team.